/ NEW SPACE INTELLIGENCEBUY ME A COFFEE
noiseproduct2026-09-22

Firefly Aerospace completes second cleanroom at Cedar Park campus

Firefly Aerospace

Firefly's new ISO Class 8 cleanroom, four times the size of its original, lets it build up to 12 landers and orbital vehicles at once.

Image: globenewswire.com
// sources · 2 attached
  1. [1]first partyfireflyspace.com↗
  2. [2]press wire · corroborationglobenewswire.com↗

what happened

Firefly Aerospace completed a new cleanroom at its Cedar Park, Texas campus with a ribbon-cutting ceremony September 22, per the company. The facility is four times the size of Firefly's existing cleanroom and, combined with it, forms an assembly line the company says can support up to 12 lunar landers and orbital vehicles simultaneously. The cleanroom holds an ISO Class 8 rating for the contamination control required during spacecraft assembly, integration and test.

why it matters

The expansion adds manufacturing throughput ahead of Firefly's ramp in lunar-lander and orbital-vehicle missions for NASA's CLPS program and its Blue Ghost and Elytra lines, a capacity bet that only pays off if contracted mission volume keeps growing at the same pace.

signal-to-noise

FIRST-PARTY
5/5
leadtier 5 of 5 on its owncorrobsources attached, no lift earned
calculation
5base tier 5 from lead source class "first_party" (Firefly Aerospace) fireflyspace.com
= 5current score, recomputed by the engine on every change

quick facts

Companies
Firefly Aerospace
Category
product
Impact
noise
SNR
5 / 5
Event date
2026-09-22
Published
2026-09-22 17:28 UTC

BACK TO THE FEED